Black Widow Security BW 3 Channel Manuale Utente Pagina 12

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 29
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 11
PAGE-12 UPDATED 11-5-2014
STEP 2: Marking panel and footing layout
Note: Before applying mounting attachments, drawing a system layout is highly recommended.
For our demonstration of the Red Widow installation we will be using a simulation roof. Fire lanes
Are not included during this example. If required by regional specifications, account for fire lane and position
Your layout accordingly.
2.1
Start at the left/top of the layout and mark the top/left corner of the first panel in the top row.
Use a lumber crayon for all marks during step 2.
2.2
Move to the left/bottom of the layout and mark the bottom/left corner of the first panel in that
row.
Patent pending P/N: RW-S, RW-B.
Vedere la pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 28 29

Commenti su questo manuale

Nessun commento